Mavista Phrom Phong stands in the Phrom Phong district of Bangkok, on Sukhumvit Soi 39. This is a central part of the city, and the project belongs to the mid-Sukhumvit area. The building is planned as a low-density residence, with only one or two apartments on each floor, which keeps the atmosphere quiet and private for the people who live there.
The project description does not list stations, roads or exact distances to nearby places, so none are given here. What is known is the address: Sukhumvit 39, in Phrom Phong, one of the most sought-after parts of Bangkok. A mid-Sukhumvit location is well known to buyers who want to live in the city centre and who are looking at large apartments with generous floor areas.
The developer is Major Development. The building is under construction, and completion is scheduled for Q4 2029. The project has one building with 32 floors. The collection of homes is small: fewer than 50 residences in total, including 45 penthouses. The layouts follow the idea of a standalone family house, combined with the services of a high-rise, and ceilings are 3 metres high throughout.
The complex has a 27-metre outdoor swimming pool, a separate meeting room and a 24-hour concierge service. For cars there are conventional spaces, automated parking, EV charging stations and spaces for disabled visitors. Parking capacity is 357%. Pets are allowed under the condominium juristic rules, and the estate has common areas and walking zones for them.
Two apartments are for sale now. The first has 3 bedrooms and 204 sq m, each bedroom with its own bathroom, plus a guest powder room and a spacious living area. The second has 5 bedrooms and 481 sq m, with a private pool. Prices range from THB 67,000,000 to THB 198,000,000. Both apartments have city views. Each apartment is reached by a private lift that opens straight into the foyer, and the building has 4 passenger lifts.
Both apartments are freehold, and no leasehold apartments are for sale. For a buyer this means full ownership of the property. Because the building is still under construction, with completion scheduled for Q4 2029, the purchase suits buyers who are ready to wait for handover. Details on layouts and deal terms are shared on request after a first inquiry.







